Welcome to Mobilarian Forum - Official Symbianize forum.

Join us now to get access to all our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, and so, so much more. It's also quick and totally free, so what are you waiting for?

Engineering Cost Estimation-Brownfield Process Plants

Alexhost
M 0

mitsumi

Alpha and Omega
Member
Access
Joined
Oct 3, 2022
Messages
6,726
Reaction score
840
Points
83
Age
35
Location
vn
grants
₲16,440
2 years of service

2291b217d557993d725b9ecadfe733ff.jpeg

Engineering Cost Estimation-Brownfield Process Plants
Last updated 8/2021
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 549.26 MB | Duration: 0h 52m

Deliverable based & Lump sum man-hour costing​

What you'll learn
Process Plant Engineering man-hour & cost estimation
Requirements
Basic knowledge on scheduling & cost estimation
Description
In chemical industry, a design and engineering company engaged in EPC of process plants is often called upon to submit their technical & commercial proposal for providing engineering services in order to carry out expansion / revamp of an existing facility or carryout modifications / upgrading to meet the stricter norms for effluent emission. These type of projects are generally called brown field projects as opposed to green field projects wherein the new project is implemented starting from scratch in a new barren plant site .This course is intended for chemical or mechanical engineers who have a couple of years of exposure to process plant engineering and field experience in a process plant so that they are aware of what is meant by a deliverable pertaining to various plant and equipment in a chemical plant. In many instances customer may not have detailed scope of work for the brown field project and will just send a brief email enquiry to EPC company to quote their fees and scope of work for the project. When the company submits its bid for EPC on this basis it is called "SUO MOTO' bid implying that action is taken by them on their own.For example, customer will inform that they want expansion/automation of an existing Reaction facility or expansion / replacement of am existing drying system or automatic bagging and transfer system with silo storage etc. Also they may ask for feasibility report with budgetary cost estimation for the project in order to get management approval for funding and implementation.When such a request comes from a customer, the engineering company have to prepare the bid for engineering on their own defining the expected scope of work / list of deliverables to be submitted and the estimated man-hour cost and timeline for executing the project. This activity needs lot of input by way of existing drawings / documents or other information to realistically estimate the EPC cost.This course attempts to give a guided path and method to the cost estimation engineer to define the scope of work , estimate the man-hour cost and submit the bid in a reliable approach.. The course will be useful to chemical or mechanical engineers who wish to work as scheduling and cost estimation engineer executing EPC of process plants.
Overview
Section 1: Introduction
Lecture 1 Introduction
Section 2: EPC Bid- Activities for costing
Lecture 2 Site Survey,, Document Retrieval & Reports
Lecture 3 Scope of Work, Deliverables & Schedule
Lecture 4 Scope Matrix
Lecture 5 Detailed, Lumpsum Cost Estimation and WBS
Lecture 6 Techno-Commercial Proposal & Software Tools
Chemical & Mechanical Engineers in EPC Companies

f14f4211a7e8263e582969e70c064a0b.jpeg

Download link

rapidgator.net:
You must reply in thread to view hidden text.

uploadgig.com:
You must reply in thread to view hidden text.

nitroflare.com:
You must reply in thread to view hidden text.

1dl.net:
You must reply in thread to view hidden text.
 
K 0

KatzSec DevOps

Alpha and Omega
Philanthropist
Access
Joined
Jan 17, 2022
Messages
605,674
Reaction score
7,812
Points
83
grants
₲58,321
2 years of service
mitsumi salamat sa pag contribute. Next time always upload your files sa
Please, Log in or Register to view URLs content!
para siguradong di ma dedeadlink. Let's keep on sharing to keep our community running for good. This community is built for you and everyone to share freely. Let's invite more contributors para mabalik natin sigla ng Mobilarian at tuloy ang puyatan. :)
 
J 0

JPQT

Squaddie
BANNED
Member
Access
Joined
Mar 11, 2023
Messages
387
Reaction score
4
Points
18
Age
26
Location
Manila
grants
₲862
1 years of service

2291b217d557993d725b9ecadfe733ff.jpeg


Engineering Cost Estimation-Brownfield Process Plants
Last updated 8/2021
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 549.26 MB | Duration: 0h 52m

Deliverable based & Lump sum man-hour costing​

What you'll learn
Process Plant Engineering man-hour & cost estimation
Requirements
Basic knowledge on scheduling & cost estimation
Description
In chemical industry, a design and engineering company engaged in EPC of process plants is often called upon to submit their technical & commercial proposal for providing engineering services in order to carry out expansion / revamp of an existing facility or carryout modifications / upgrading to meet the stricter norms for effluent emission. These type of projects are generally called brown field projects as opposed to green field projects wherein the new project is implemented starting from scratch in a new barren plant site .This course is intended for chemical or mechanical engineers who have a couple of years of exposure to process plant engineering and field experience in a process plant so that they are aware of what is meant by a deliverable pertaining to various plant and equipment in a chemical plant. In many instances customer may not have detailed scope of work for the brown field project and will just send a brief email enquiry to EPC company to quote their fees and scope of work for the project. When the company submits its bid for EPC on this basis it is called "SUO MOTO' bid implying that action is taken by them on their own.For example, customer will inform that they want expansion/automation of an existing Reaction facility or expansion / replacement of am existing drying system or automatic bagging and transfer system with silo storage etc. Also they may ask for feasibility report with budgetary cost estimation for the project in order to get management approval for funding and implementation.When such a request comes from a customer, the engineering company have to prepare the bid for engineering on their own defining the expected scope of work / list of deliverables to be submitted and the estimated man-hour cost and timeline for executing the project. This activity needs lot of input by way of existing drawings / documents or other information to realistically estimate the EPC cost.This course attempts to give a guided path and method to the cost estimation engineer to define the scope of work , estimate the man-hour cost and submit the bid in a reliable approach.. The course will be useful to chemical or mechanical engineers who wish to work as scheduling and cost estimation engineer executing EPC of process plants.
Overview
Section 1: Introduction
Lecture 1 Introduction
Section 2: EPC Bid- Activities for costing
Lecture 2 Site Survey,, Document Retrieval & Reports
Lecture 3 Scope of Work, Deliverables & Schedule
Lecture 4 Scope Matrix
Lecture 5 Detailed, Lumpsum Cost Estimation and WBS
Lecture 6 Techno-Commercial Proposal & Software Tools
Chemical & Mechanical Engineers in EPC Companies

f14f4211a7e8263e582969e70c064a0b.jpeg

Download link

rapidgator.net
:
*** Hidden text: cannot be quoted. ***


uploadgig.com:
*** Hidden text: cannot be quoted. ***


nitroflare.com:
*** Hidden text: cannot be quoted. ***


1dl.net:
*** Hidden text: cannot be quoted. ***
Thank you po
 
Top Bottom