Welcome to Mobilarian Forum - Official Symbianize forum.

Join us now to get access to all our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, and so, so much more. It's also quick and totally free, so what are you waiting for?

Capital Cost Estimation For Brownfield Chemical Projects

Alexhost
M 0

mitsumi

Alpha and Omega
Member
Access
Joined
Oct 3, 2022
Messages
6,726
Reaction score
840
Points
83
Age
35
Location
vn
grants
₲16,440
2 years of service

1b8f5b531134ff13d53393bee16c19ae.jpeg

Capital Cost Estimation For Brownfield Chemical Projects
Last updated 9/2022
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 546.39 MB | Duration: 0h 50m

CapEx-Methodology for capital cost estimation with +/- 20% variation for Brownfield Chemical Projects​

What you'll learn
Explains simple methodology for estimation of CapEx for Brownfield chemical projects
How to identify the various cost heads to be covered for Capex
Importance of site survey and approach to costing for Brownfield chemical projects
Example of a brownfield project CapEx with steps and templates
Requirements
Chemical/Mechanical Engineers with fair knowledge of process plant-Machinery and piping.
Description
On many occasions, an EPC company entrusted with the task of submitting a bid for detailed engineering for a brownfield chemical project, would be asked to submit a preliminary capital cost estimate (CapEx) for the proposed project in order to obtain budgetary sanction from the management for implementation.As already stated in my course Engineering cost estimation-Brownfield chemical projects , preparation of CapEx requires certain details and inputs from the customer as also data collected by the EPC company during site survey to assess the scope of the project. Further preliminary drawings like P&ID, Site Layout along with details of scope work are essential for performing this cost estimation.This lecture attempts to define a practical methodology for CapEx estimation with a +/-20% variation in cost for a brownfield project in view of the limited details available for cost estimation and the need to comply with a short timeline specified by customer. Generally this activity will take about 4 to 6 weeks to make the estimate based on site survey report and drawings /data made available.Here, we have assumed that supply of utilities like power, Process water, Cooling water, DM Water, Compressed Air, Instrument Air, Nitrogen, RM and main product storage tanks, vacuum System, Laboratory are under customer scope from existing facilities and only tie-ins for piping , electrical and instrumentation are to be covered in the cost estimation. This project is only an expansion of facility for manufacture by installation of above equipment with minimal investment for civil and structural works. The existing pipe and cable racks shall be extended to cover this new facility . This facility may need a new building to house the above equipment along with new MCC and addition of I/O cards in existing DCS.The first step is creating an individual Excel template to capture the various expenditure to be incurred under all disciplines and populate the details based on above preliminary drawings/documents and site survey reports.
Overview
Section 1: Introduction
Lecture 1 Introduction
Lecture 2 Capex Methodology
Lecture 3 Drawings and Documents required
Section 2: CapEx estimation
Lecture 4 CapEx estimation Templates
Lecture 5 Land Development
Lecture 6 Buildings and Structures
Lecture 7 Process Plant Machinery
Lecture 8 Process Plant Equipment List and Cost
Lecture 9 CapEx-Mechanical and Piping
Lecture 10 CapEx-Equipment Erection, Piping, Painting and Insulation
Lecture 11 Capex-Electrical works-Supply and Installation
Lecture 12 CapEx-Instrumentation-Supply and Installation
Lecture 13 CapEx-Design, Detailed Engineering and Statutory Approvals
Lecture 14 CapEx Summary and Conclusion
Project / Cost estimation engineers in EPC companies executing process plants

034029ba34849882c81ffbd3852aba09.jpeg

Download link

rapidgator.net:
You must reply in thread to view hidden text.

uploadgig.com:
You must reply in thread to view hidden text.

nitroflare.com:
You must reply in thread to view hidden text.

1dl.net:
You must reply in thread to view hidden text.
 
K 0

KatzSec DevOps

Alpha and Omega
Philanthropist
Access
Joined
Jan 17, 2022
Messages
605,621
Reaction score
7,812
Points
83
grants
₲58,321
2 years of service
mitsumi salamat sa pag contribute. Next time always upload your files sa
Please, Log in or Register to view URLs content!
para siguradong di ma dedeadlink. Let's keep on sharing to keep our community running for good. This community is built for you and everyone to share freely. Let's invite more contributors para mabalik natin sigla ng Mobilarian at tuloy ang puyatan. :)
 
Top Bottom